Office Fit Out Contractors in Oxford

Cat A, Cat B and full office refurbishment for Oxford's landlords and occupiers, every core trade in-house.

Workspace and offices

Office fit out and refurbishment contractors for Oxford and Oxfordshire

The Lynch Brother Group is an office fit out contractor for Oxford and Oxfordshire: Cat A and Cat B fit outs, office refurbishment and dilapidations works at the end of a lease. We work for landlords letting space and for the businesses that occupy it, in the city centre, on the business and science parks around it and inside college and institutional estates. Tell us what the floor has to do; we will survey it before we price it.

What we deliver in offices

  • Cat A fit out

    A Cat A fit out puts raised floors, suspended ceilings, base services and finishes into a bare floor so it can be marketed and let, with the programme built around the landlord's letting date.

  • Cat B fit out

    A Cat B fit out builds the occupier's own layout to its designer's drawings: rooms and partitions, a kitchen and breakout space, the finishes its people will see every day, and the data and power routed to suit.

  • Full building refurbishment

    A tired building brought back: the structure and envelope work first, then new floors, services and finishes, phased around the tenants who stay, as our fit out and refurbishment page sets out.

  • Reception and common parts

    Entrances, receptions, lift lobbies, stairs and washrooms: the shared parts of a building that let a landlord re-let it, and the first thing a visitor sees.

  • Office-to-laboratory conversion

    Where an engineer's design allows it, we strengthen the floor, form the risers and plant space, and put in the drainage, ventilation and power a laboratory needs; the fit out of the laboratories follows.

  • Dilapidations and hand-back

    Strip out, repairs and redecoration to the schedule of dilapidations when a lease ends, for tenants handing space back and landlords taking it back to re-let.

  • Planned maintenance

    Redecoration cycles and repairs under planned maintenance, so an office stays lettable between refurbishments.

Working in an office building

Occupied buildings

Many office fit outs happen in a building that is still working: your own staff in the next zone, or other tenants above and below. We phase the work floor by floor, put the noisy trades into the hours you set, keep deliveries away from your entrance, and hand each floor back clean before the next one closes.

Landlord and tenant

A Cat A fit out is the landlord's work. A Cat B fit out is the tenant's, and it needs the landlord's written consent, usually a licence to alter. We work for either side. We build to the drawings and hand over a record of what was done, so the hand-back at the end of the lease starts from the record, not from memory.

The programme

An office fit out is priced from the drawings and a survey and run to one programme. The structure, the screed and the decoration are our own trades. When the tenant adds a meeting room after the partitions are set out, the same site team re-sequences the work; nobody waits on another firm's diary.

How we deliver in Oxford's office buildings

The office work we do falls into two kinds. A landlord has a floor or a building coming back and wants it let: a Cat A fit out, the common parts brought up to standard, the last tenant's dilapidations put right. Or a business has taken space and wants to move in on a date: a Cat B fit out to its own design, with the meeting rooms, the kitchen and the finish its people will see every day.

Both kinds run to the same rule: one contractor, one programme. The structure, the screed and the decoration are our own trades, so when the programme tightens, the trades we need to move are our own. The mechanical and electrical work runs on the same programme and is tested before handover.

Oxford sets its own conditions. City-centre buildings sit on narrow streets, often with no loading bay, next to neighbours who are trading, so we time deliveries and keep the pavement clear. Landlords on the business and science parks around the city set their own hours and access rules, and we work to them. College and institutional offices sit inside estates with their own estates teams, whose permits, hours and term dates we plan around.

After handover the office need not leave our hands: property management and planned maintenance keeps it in repair, and the dilapidations works put it back to the schedule when the lease ends. Our fit out and refurbishment page explains Cat A, Cat B and full refurbishment in more detail.

Contact us

How an office fit out runs

From the survey to the day you move in

Every office is priced from its own survey. Ask us for yours.

Contact us

  1. Survey and brief

    We walk the space with you and read the lease: what the floor has to do, what the landlord requires, what stays and what goes, and the date the business needs to be in.

  2. Design and price

    Working to your designer's drawings, we price the work package by package, Cat A and Cat B shown separately where a job has both, so you see what each part costs before anything is ordered.

  3. Programme and phasing

    We agree the phasing before we start: which floors close when, where the noisy work sits in the day, how deliveries reach the site, and the hours that suit the people still in the building.

  4. Strip out and first fix

    The old fit out comes out and we form the structure and openings. Then first fix: the cable routes, pipework and ductwork for power, data and ventilation, run before any wall or ceiling closes in.

  5. Fit out and finish

    Screed where the floor needs it, then partitions, ceilings and joinery, then second fix and the floor finishes. Our own decorators paint and finish the space last, so the final trade on site is ours.

  6. Handover and after

    We clean the space, test the services and hand over the drawings and records. The same group can maintain the office and, when the lease ends, put it back to the schedule of dilapidations.

FAQs

What does an office fit out include?

It depends on the category. A Cat A fit out includes raised floors, ceilings, base mechanical and electrical services, lighting and finishes: the floor is ready to let. A Cat B fit out adds the occupier's layout: partitions, meeting rooms, a kitchen and breakout space, the data and power for the desks, and the decoration. On many office jobs we also renew the reception, lift lobbies and washrooms so the building matches the floor.

Can you fit out an office while we are still working in it?

Yes, and many are. We phase the work floor by floor or zone by zone, put the noisy and dusty work into the hours you set, and seal off the areas still in use behind dust screens. Escape routes and the fire alarm stay live throughout, and power and data shutdowns are booked with you in advance. Deliveries and skips stay away from your entrance, and each finished area is cleaned and handed back before the next closes.

What is the difference between an office fit out and an office refurbishment?

A fit out prepares a space for use: Cat A brings a shell, the bare floor a developer hands over, to a lettable standard, and Cat B makes it a particular occupier's office. A refurbishment renews a building or floor that is already fitted out, and often reaches into the fabric: new services, new windows, structural changes, the common parts. The two often meet on one job, and one company can do both.

How much does an office fit out cost in Oxford?

The price of an office fit out in Oxford is set by the space, not by a rate card. The area, the split between Cat A and Cat B, the mechanical and electrical scope, the finishes and the hours the building gives us all move it. City-centre access and out-of-hours working add to it. We price every job from the drawings and a survey. Our cost guide shows what a per-square-foot figure includes and what it leaves out.

Do we need the landlord's permission to fit out our office?

Your lease decides, and your agent or solicitor will tell you. A tenant's works normally need the landlord's written consent, a licence to alter, which they arrange. Our part is the works. We supply the drawings, specification and method statements the landlord's surveyor asks for, we work to the conditions in the consent, and we hand over the record of what was built, which the hand-back at the end of the lease relies on.

Do you take on small office fit outs?

Yes. A small office fit out in Oxford, a single suite, one floor or a reconfigured meeting room, is priced from the drawings and a survey like any other job and run by a site team sized to it. Small jobs in occupied buildings need the same care with hours, dust and deliveries as large ones. Tell us the space and the date and we will say what can be done in it.

Something else on your mind? Ask us directly.

Ready to talk about your project?

Let's talk.

Planning something serious — commercial, residential or a property portfolio that needs looking after? Send the outline and we'll take it from there.

We use what you send to answer your enquiry. Privacy policy.