How we deliver the finishes
On most projects the decorator is the last subcontractor in and the first to lose time when the programme slips. In the Lynch Brother Group the decorators are our own team, and on our own projects they are in the programme from the start. The same site team that ran the fit out or the new build runs the finishes, so the sequence holds to the end.
Other main contractors, landlords and institutions can also book our decorators and tilers as a package. We work to your programme and on your site, priced by the people who will do the work. On our own projects the decorating and tiling sit inside the contract. In both cases the finishes schedule, the paint systems and the dates go in writing before we start.
Oxford's colleges, shops and offices give us much of this work, and most of them stay open while we decorate. We repaint a college staircase between terms, decorate a shop out of hours, and do an office floor by floor with the next floor still working. We plan the hours, the protection and the access with you, and we use low-odour, water-based systems where people are in the building.
Decorating also completes other work on a building. After dilapidations works, redecoration is the last item on the schedule before the keys go back. After a retrofit, the internal redecoration finishes the job. A planned maintenance programme keeps the redecoration on a cycle, so the whole building is not done at once.
Contact us