Office Dilapidations Contractors in Oxfordshire

Strip out, repairs, redecoration and making good, priced item by item from the schedule and planned back from the lease date.

Dilapidations

Office dilapidations contractors for tenants and landlords

The Lynch Brother Group is an office dilapidations contractor for tenants and landlords across Oxford and Oxfordshire. We take a schedule of dilapidations and carry out the works it lists, from strip out and repairs to redecoration and making good, in offices, shops and laboratories, to a programme that ends before the lease does. Send us the schedule and the lease date; we will price every item and say what can be done in time.

What's included in dilapidations works

  • Schedule pricing

    Every item on the schedule of dilapidations priced on its own, so you and your surveyor can see what each one costs to put right.

  • Strip out and removals

    Removal of the partitions, ceilings, floor finishes, cabling and fixtures the schedule says must come out, with the waste cleared and documented.

  • Reinstatement

    Putting back what the fit out took away: openings closed, floors and ceilings made good, services capped off or put back as first provided.

  • Repairs

    Repairs to the walls, floors, doors, ironmongery and windows the schedule lists, done by our own trades to the standard the schedule sets.

  • Mechanical and electrical

    Lighting, power, heating and ventilation returned to a safe, working condition, tested and certified for the landlord's surveyor.

  • Redecoration

    Redecoration in the colours and finishes the schedule specifies, by our own decorators, usually the last trade before the keys go back.

  • Cleaning and handover

    A final clean, the waste notes and certificates in one pack, and the premises ready for the landlord's inspection on the agreed date.

Tenants, landlords and the lease date

For tenants

Office dilapidations are the repairs, reinstatement and redecoration a lease requires when the premises are handed back, at the end of the term or at a break clause. The landlord's schedule lists the gap between that condition and what is there now. You can settle that with the landlord, or have the works done before the date. If you do the works, you set the scope and see the price of every item first.

For landlords

When a tenant has gone, the space has to earn again. We carry out the reinstatement, repairs and redecoration that bring it back to a lettable standard. If the next tenant is already lined up, the same team carries straight on into their fit out.

Lease ends and break clauses

A lease end date or a break clause date does not move, so the programme runs backwards from it. We fix the start date, the sequence and the handover date with you, and the programme ends with time in hand for the landlord's surveyor to walk round.

How we deliver dilapidations works

Office and commercial dilapidations works are usually let to several firms: a strip-out crew, a builder, an electrician and a decorator, each with their own programme and each waiting on the last. Ours run as one programme. Strip out, building work and decorating and finishes are done by our own teams, sequenced by one site team, with one point of accountability from the first survey to the inspection.

We price from the schedule, not from a lump sum. Each item gets its own figure. Your surveyor negotiates from real numbers, and you decide item by item which works to do now. Ask for it as soon as the schedule arrives.

Much of this work is in Oxford and across the county, in buildings that are still busy. Other tenants are trading on the floors above and below, and sometimes your own staff are still in the space. We plan the noisy work, the deliveries and the out-of-hours shifts with you and with the landlord or their managing agent, so the building keeps working while the premises come back to condition.

For landlords, the job need not end at the inspection. The same group can keep the building in repair through property management and planned maintenance, from people who already know it. If you are new to the process, our article What is a schedule of dilapidations? explains the document itself.

Contact us

How dilapidations works run

From the schedule to the keys going back

Every schedule is priced item by item from its own survey. Send us yours.

Contact us

  1. Schedule and survey

    Send us the schedule of dilapidations and the lease date. We walk the premises, check every item against what is there, and tell you where the schedule and the premises do not match.

  2. Price and programme

    A price for each item and a programme that ends before the lease date. You and your surveyor see what every item costs to put right before anything is agreed.

  3. Agree the scope

    You decide which items to do and which to negotiate. We fix the price for the agreed scope and book our trades, so the start date holds and the end date is safe.

  4. Strip out and repairs

    We take out the partitions, finishes and fixtures, close the openings and make the repairs, sequenced around the neighbours still trading above, below and beside you.

  5. Services and redecoration

    We return lighting, power, heating and ventilation to a safe, working condition and test them. Our own decorators follow behind, and we clean the space for inspection.

  6. Inspection and handover

    We attend the landlord's inspection, deal with anything it raises, and hand over the certificates and waste notes with the keys before the lease date.

FAQs

Who pays for dilapidations?

The lease decides. It sets the condition the premises must be handed back in, and the landlord's surveyor lists what falls short in a schedule of dilapidations. The tenant can then settle the schedule with the landlord or have the works done before the lease ends. Your surveyor will advise which. Our part is the works: we price each item on the schedule, so you know what it would cost to put right before you decide.

How long does a landlord have to claim?

The time limits are a question for your surveyor or solicitor. For the works, one date matters: the day the lease ends or the break takes effect. For a tenant, the premises must be back in condition by then, so the sooner we see the schedule, the more we can do in time. For a landlord, the works can start the day the keys come back. Either way, talk to us before the schedule is final.

Is the dilapidations protocol mandatory?

That is one for your surveyor or solicitor, but in practice both sides work to it. The Dilapidations Protocol is the pre-action protocol for England and Wales: it sets out how the landlord's schedule and the tenant's response are exchanged before a claim reaches court. Where we come in is the response. A reply with a contractor's price against each item has real numbers behind it, so we price every item separately and give the figures to your surveyor.

What does a dilapidations contractor actually do?

A dilapidations contractor carries out the works the schedule describes: strip out, reinstatement, repairs, mechanical and electrical works, redecoration and the final clean. We price each item, plan the programme back from the lease date, attend the landlord's inspection and hand over the certificates and waste notes with the keys. We do not prepare or negotiate the schedule; that is your surveyor's work, and we work alongside them.

Can dilapidations works be done while the office is occupied?

Yes, and they often are. Works are phased floor by floor or room by room, with the noisy work in agreed windows, and out-of-hours shifts where the lease limits working hours or the neighbours need quiet. Deliveries and waste are routed away from the areas still in use. The same applies to works under an interim schedule of dilapidations during the term, where the tenant stays in occupation and the building has to keep working around the trades.

Something else on your mind? Ask us directly.

Ready to talk about your project?

Let's talk.

Planning something serious — commercial, residential or a property portfolio that needs looking after? Send the outline and we'll take it from there.

We use what you send to answer your enquiry. Privacy policy.